BaoCloud Data Center

The total investment in phase one of Baocloud Big Data Center's development programme is 500 million RMB and with a construction area of 40,000 square meters and over 40000 racks deployed already,  XGOAL recommended a pre-terminated fiber and Cat 6A copper solution for the Ordos Big Data Center cabling system.

BAOSIGHT is a global provider of IT solutions, ranging from global secure hosting and connectivity to managing all security, networking, server and database technologies for a full range of market sectors.
The BAOSIGHT Data Centre team worked closely alongside the BAOSIGHT team to implement the required cabling infrastruture and data centre racking solution at the Baocloud Data Centre in china.

Total 4000 cabinet racks, the project ran on site for just 10 months with the BAOSIGHT team installing and testing XGOAL pre-terminated cabling system, placing racks in situ including installation of power bars and door combination sets.

Each Equipment Distribution Area (EDA) is connected to a Horizontal Distribution Area (HDA) by Cat 6A FTP cable and 24 cores pre-terminated OM3 fibers; each HDA is connected to a Main Distribution Area (MDA) (there are two MDAs in this project, MDA-A and MDA-B) connected by Cat 6A FTP cable and 12 cores pre-terminated OM3 fibers; MDA-A and MDA-B are connected by Cat 6A FTP cable and 48 cores pre-terminated OM3 fibers. 